
Muhammad Usman Bashir
I have worked in Power sector on substation and grid station .Roles and responsibilities include installation... | Peshawar District, Khyber Pakhtunkhwa, Pakistan
*50 free lookup(s) per month.
No credit card required.
Muhammad Usman Bashir’s Emails mb****@mo****.com
Muhammad Usman Bashir’s Phone Numbers No phone number available.
Social Media
Muhammad Usman Bashir’s Location Peshawar District, Khyber Pakhtunkhwa, Pakistan
Muhammad Usman Bashir’s Expertise I have worked in Power sector on substation and grid station .Roles and responsibilities include installation and commissioning of OHTL, substation (G s insulated switchgear, LCC local control cubical with protection and supervision relays are installed,BCU bay control unit and synchroscope used to measure double voltge and double freequency) ,T/R ,Switchgear,control room panels and communication room panel according to SLD single line drawing. Installation of SS_OPGW(4 way) and SS_OPGW U/G (4 way) with splicing and testing By OTDR. 1)SS_OPGW(4 way): Optic fiber joint boxes shall be installed on transmission line structures 5 meters above ground outside substation area.OPGW joint boxes grounded according to company standards. 2)SS OPGW U/G(4 way): At the gantry structure optic fiber shall be installed 3 meters above ground.weather tight connector is used for connecting PVC coated metal conduit with joint box cable entry and galvanized steel pipe.conduit must be sealed at both ends. Splicing is of fusion type by using splicing machine with built in splice loss measurement and recording hard copy print capabilities. Supervised and witnessed splicing activity and splice loss measurement by OTDR with hard copy print recording for play back. Attenuation of fiber splice should not exceed .05 db per splice.splice loss should not exeed .15 db at one end. GRID STATION UNIVERSITY ISLAMABAD Feb 2014 to Jan 2015 220KV University Grid Station installation along with 250MVA and 160MVA Auto Transformer. This Grid Station is being fed from 500KV Grid .Monitoring of Electrical Work incl Managing data of sites in the form of checklist, PPT and database including all site information with snapshots
Muhammad Usman Bashir’s Current Industry Mobiserve Holding
Muhammad
Usman Bashir’s Prior Industry
Zain Electric
|
Enres Engineering
|
Mobiserve Holding
Not the Muhammad Usman Bashir you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Mobiserve Holding
Field Engineer
Thu Mar 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Enres Engineering
Electrical Site Engineer
Mon Apr 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Jun 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
Zain Electric
Electrical Engineer
Tue Feb 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Mar 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time)